Discover Boating

Dong Nai

port of Dong Nai
Lat: 18 5 N; Long: 106 19 E.
Time Zone : GMT +7 h
UNCTAD Locode : VN DNA
Admiralty Chart : 1261
Admiralty Pilot : 30
containers
lo / lo
containers
ro / ro
vehicles passengers bunkering Dry
Bulk
Grain &
Feedstuffs
Fruit &
Vegetables
Chilled
Products
Hazardous
Cargos
Forest
Products
Oil /
Petroleum
Liquid
Bulk
General
Cargo
Heavy Lift
Cargo
Livestock Fish
advert Compass Web Development
Authority : Dong Nai Port JSC, Long Binh Tan Ward, Bien Hoa, Dong Nai Province, Vietnam, Tel: +84 61 383 2225, Fax: +84 61 383 1259, Email: dongnaiport2@gmail.com, Website: www.dongnai-port.com
Director: Nguyen Manh Tien.
Accommodation: There are also two buoy berths in depth of 9 m
1Long Binh Tan Terminal: Situated on the Dong Nai River in pos 10 54 01" N; 106
50 29" E
2Go Dau A Terminal: Situated on the Thi Vai River in pos 10 39 28" N; 107 01 16"
E
Terminal Office, Tel: +84 61 354 3328, Fax: +84 61 384 1252
3Go Dau B Terminal: Situated on the Thi Vai River in pos 10 37 08" N; 107 01 26"
E
Terminal Office, Tel: +84 61 384 1599, Fax: +84 61 354 3790
Tides: Average tidal range of 3 m (Long By nh Tan), 4.6 m (Go Dau A) and 4.6 m (Go
Dau B)
Traffic: 2007, 775 vessels, 2 922 280 t of cargo handled
Maximum Vessel Dimensions: Long By nh Tan: 5000 dwt. Go Dau A: 2000 dwt. Go
Dau B: 12 000 dwt
Storage: Total area: 443 000 m2 (Long Binh Tan: 43 000 m2; Go Dau A: 180 000 m2;
Go Dau B: 220 000 m2). Warehouse/shed: 5000 m2; Open yard: 80 000 m2; Tank:
3000 m2 with total storage 200.000 t
Development: Construction of Berth A3 (Go Dau A Terminal) for vessels up to 10 000
dwt expected to be completed by June 2006
Construction of Berth B4 (Go Dau B Terminal) expected to be completed by May
2006
Pilot boards in pos 10 20 N; 107 02 E